Bridges - Overview
We have an expert staff with the experience and knowledge necessary to provide high quality design services for your bridge projects.  Our vast project experience includes numerous on-system, off-system and non off-system bridge projects throughout the state of Missouri.
Bridges
Mr. Tary Todd, P.E., Director of Bridge Design, is responsible for the technical work and overall project management of our bridge projects.  Mr. Todd has been involved with the design, management and construction of off-system and non off-system bridge projects throughout the state of Missouri.  His design experience involves structures utilizing pre-cast, pre-stressed concrete members, structural steel plate girders, post-tensioned concrete members, reinforced concrete box culverts and large diameter corrugated metal pipes.  He also has considerable experience in bridge rehabilitation work and working with county bridge crews.  Mr. Todd has also performed the production and review of shop drawings for several clients.

Bridge Design Experience


Bridge Rehabilitation and Large Culverts

► City of Old Monroe, bridge rehabilitation project (repair flood damage, bearing restrainers).

► City of Marquand, bridge rehabilitation project (pier replacement, span replacement).

► Randolph County, bridge rehabilitation project (additional spans).

► Iron County, bridge rehabilitation project (superstructure replacement).

► Lake Tishomingo Property Owners Association, bridge replacement with large diameter pipe.

► Busch Creek, Franklin County, Missouri – Box Culvert, 3–10x10, 310’ long.

► St. Andrews Place, Union, Missouri – Bridge Span, 2–10x12, 50’ length.

► St. Albans, Franklin County, Missouri – 2-10x12, 40’ length.

► Washington Street, Union, Missouri – Arch-Box, 24’ wide, 8’ tall, 40’ length.

 

cochraneng.com © 2006    Privacy Policy